FUMRON · HVAC CONTROLS & SYSTEM SOLUTIONS
Home / Products / FM10
FM10 · Colorful Touchscreen BACnet & Modbus Thermostat for 2/4-Pipe FCU

Fan coil & DX / FM10

Colorful Touchscreen BACnet & Modbus Thermostat for 2/4-Pipe FCU

Room control for 2-pipe or 4-pipe fan coils, with fan and valve outputs selected to suit the installation.

Wi-Fi optionModbus RTU optionModbus TCP optionBACnet MS/TP optionBACnet IP optionLoRaWAN optionMQTT optionZigbee option

AT A GLANCE

Control essentials

  • 3.5” TFT real color touchscreen
  • Humidity sensor, Ambient light sensor
  • Wi-Fi connectivity (Option)
  • SmartLife App (Option)
  • SmartLife Zigbee (Option)
  • LoRaWAN 868MHz/915MHz (Option)
  • BACnet MS/TP / IP (Option)
  • Modbus RS485 RTU / TCP (Option)
  • BLE 5.0 (Option)
  • Customized MQTT (Option)
  • 3-speed on/off, 0–10VDC fan control
  • On/off, 0–10VDC valve control
  • 7-day, weekday/weekend, 24-hour schedule
  • History data tracking diagram (up to 4 weeks)
  • 3 inputs: Keycard, Occupancy, Window Open
  • External sensor (control AC or fan)
  • Defrost protection
  • Auto season changeover
  • Multi-language (9 languages)
  • C/F temperature display
  • 12/24-hour time format
  • Touch screen lockout
KEY SPECIFICATIONS
Power Supply24V or 230V
Application2-pipe / 4-pipe fan coil, by variant
Interface3.5″ capacitive touchscreen
Fan output3-speed on/off or 0–10 V DC, by variant
CommunicationOptional RS-485: Modbus RTU / BACnet MS/TP. Selected Wi-Fi network configurations: Modbus TCP / BACnet IP / customized MQTT. Tuya Wi-Fi, LoRaWAN, Tuya Zigbee.
Valve outputOn/off or 0–10 V DC, by variant

Dimensions & Installation

Click a drawing to enlarge.

FM10 · Dimensions & Installation 1
FM10 · Dimensions & Installation 1
FM10 · Dimensions & Installation 2
FM10 · Dimensions & Installation 2
FM10 · Dimensions & Installation 3
FM10 · Dimensions & Installation 3
FM10 · Dimensions & Installation 4
FM10 · Dimensions & Installation 4

Apartment application selection →

Features and communication options vary by configuration. Confirm the supply voltage, outputs and protocol before ordering.

YOUR PROJECT, DEFINED

Start with your system.

Outline the equipment, rooms and control requirements for your project.

Prepare a project brief ↗